Working with a world-renowned heritage venue requires a careful and considered approach, therefore detailed site plans and surveys were prepared.
This was a challenging instalation due to location and distance from road. To preserve the road surface a lightweight crane was required and protective matting placed on the floor. In addition, not hitting the incredibly culturally significant statue was a critical factor.
- Detailed site plans and surveys were required
- Ensuring road surfaces were not dammaged during the instalation
- Delivering within restricted access windows
- Ensuring full compliance with conservation and risk management